




Soapstone Mist Concrete Finish - Quartz Slab
Natural engineered quartz with the low-porosity body and non-reactive surface that defines premium slab work, MSI Soapstone Mist Concrete Finish - Quartz Slab arrives in standard 2cm and 3cm thicknesses. The veining holds its character across the cut, so a multi-piece kitchen design reads as one continuous composition rather than several joined pieces.
Overview
About this product
Natural engineered quartz with the low-porosity body and non-reactive surface that defines premium slab work, MSI Soapstone Mist Concrete Finish - Quartz Slab arrives in standard 2cm and 3cm thicknesses. The veining holds its character across the cut, so a multi-piece kitchen design reads as one continuous composition rather than several joined pieces. Slab-to-slab variation in quarried stone is the design payoff rather than a quality issue; engineered alternatives deliver consistency at the cost of the natural character that distinguishes premium kitchen work. Pairs with both modern and traditional cabinetry, the slab's tonality dictates whether the kitchen reads contemporary or transitional, and the rest of the design takes its cues from there.
What earns this kind of stone its specification is what it does in years three and four, the way it holds its color, the way the polished face stays bright, the way the edge work softens just enough to read as lived-in rather than worn. What earns this kind of stone its place in design-led residential work is what it does in years three and four, the way it holds color, the way the polished face stays bright, the way the surface develops the quiet patina of attentive use. Once installed, the surface absorbs the day-to-day of cooking and cleaning without revealing the wear that compromises softer-stone alternatives. Sealing follows standard protocol for the material, annual for marble and granite, optional for engineered quartz, mineral oil for soapstone.
Quality & Assurance
Specifications
Questions
Stone FAQ
Will Soapstone Mist Concrete Finish - Quartz Slab work for my project?
Does this stone need sealing or special care?
What is the difference between a slab and a prefab countertop?
How heat, scratch, and stain resistant is it?
Do you help with fabrication and edges?
Good to Know
Ordering & delivery
Most orders are processed and on their way within 1–3 business days. You’ll receive tracking the moment your order ships.
Talk to a specialist for sizing, pairings, or any product question. Our team is here before and after every order.
Ships nationwide with free freight on orders over $3,500. Larger orders ship by LTL freight, scheduled to your address.
Customer Reviews
Trusted by Homeowners & Contractors
Every review is from a confirmed Citadel purchase. Ratings reflect product quality, freight handling, and support.
Built for the spaces you live in
Premium materials, vetted for finish and durability, delivered nationwide and ready for the install that lasts.
Common Questions
Ordering & Support
Why Citadel
A surfaces superstore,
built for the trade
Family-run, Citadel brings 5,000+ premium surfaces from the brands you trust under one roof, at wholesale-direct pricing, with nationwide freight delivery. No membership, no markup games, just specialists who know the material.

Design & Detail
From the Journal











